It has set up steady cooperation with several well acknowledged universities and institutes in china this kind of as, Zhejiang College, Jilin College, Specialized committee of national chain drive common, Institute of countrywide chain drive, Zhejiang software engineering materials institute, Huhan material defense institute and it cooperated to located China 1st Vehicle chain institute with Nationwide chain generate institute. Thanks to our broad solution assortment and wealthy ordeals in this sector, The group is concentrated on producing all assortment of regular roller chains and sprockets, gears & gearboxes, these kinds of as conveyor chain & sprockets , stainless steel chain, agricultural chain and has not just bought its items all more than china, but also bought more than 65% products to oversees, including Europe, The us, South-east Asia, and it also has established up storage logistics in places like Europe.
EPTT leading producer for Contruction Raise constructing Guy hoisting Carry with 500kg~3000kg load
A. Major Merchandise
EPTT foremost maker for Contruction Lift creating Male hoisting Raise with 500kg~3000kg load
Its principal collection incEPTT:
one. Lower, medium, and higher-speed variable frequency creating EPTT carry guy carry.
two. EPT purpose design hoist, this sort of as EPTT EPTT cold water tower development lifts, mini rack creating EPTT raise gentleman elevate for tower crane, and EPT building EPTT lift gentleman lift.
three. Mast climbing doing work system, Mast climber
4. EPTs EPTT hoist, resources system
5. Suspended Platform, Wall gondolas, building cradle
six. Other OEM kind rack and pinionbuilding EPTT elevate gentleman raise, passenger hoist, rack raise.
Common PLC EPTT creating EPTT lift man carry
Specification | Sort | EPT Capability | EPT Speed | EPT EPTT | Safety Unit |
One cage | SC100 | 1000Kg |
33m/min |
two*11Kw | SAJ 30-one.2 |
SC150 | 1500Kg | two times13Kw | SAJ 40-1.two | ||
SC200 | 2000Kg | 3 times11Kw | SAJ forty-1.2 | ||
Twin cages | SC100/a hundred | 1000KEPTTimes2EA | two times11Kw times2EA | SAJ thirty-1.2 | |
SC150/150 | 1500KEPTTimes2EA | 2 times13Kw times2EA | SAJ forty-one.two | ||
SC200/two hundred | 2000KEPTTimes2EA | 3 times11Kw times2EA | SAJ forty-1.2 |
Minimal pace developing EPTT carry guy carry
Specification | Typemodel | EPTCapacity | EPT Velocity | EPT EPTT | VFD | SafetyDevice |
Solitary cage | SC100 | 1000Kg | ~33m/min ~40m/min |
two times11Kw | 30Kw | SAJ 30-one.2 |
SC150 | 1500Kg | ~36m/min ~46m/min |
two times13Kw 2 times15Kw | 30Kw 37Kw | SAJ 40-one.two | |
SC200 | 2000Kg | ~40m/min ~46m/min |
2 times15Kw 3 times11Kw | 37Kw | SAJ 40-1.2 | |
Twin cages | SC100/one hundred | 1000KEPTTimes2EA | ~40m/min | 2 times11Kw times2EA | 30Kw times2EA | SAJ 30-one.2 |
SC150/one hundred fifty | 1500KEPTTimes2EA | ~36m/min ~46m/min |
two times13Kw times2EA two times15Kw times2EA |
30Kw times2EA 37Kw times2EA | SAJ forty-one.two | |
SC200/200 | 2000KEPTTimes2EA | ~40m/min ~46m/min |
two times15Kw times2EA two times11Kw times2EA |
37Kw times2EA | SAJ 40-1.two |
Reasonable pace building EPTT carry gentleman carry
Specification | TypeModel | EPTCapacity | Lifiting Velocity | EPT EPTT | VFD | SafetyDevice |
Single cage | SC a hundred | 1000Kg | ~60m/min | three times13Kw | 45Kw | SAJ thirty-1.4 |
SC 150 | 1500Kg | ~63m/min ~60m/min |
3 times15Kw 2x19Kw(87Hz) | 45Kw 55Kw | SAJ 40-1.4 | |
SC two hundred | 2000Kg | ~60m/min ~63m/min ~70m/min ~75m/min |
2 times23Kw(87Hz) 3 times15Kw 3 times19Kw(87Hz) three times23Kw(87Hz) |
55Kw
75Kw |
SAJ forty-one.4
SAJ50-1.six |
|
Twin cages | SC100/a hundred | 1000KEPTTimes2EA | ~60m/min | three times13Kw times2EA | 45Kw | SAJ 30-1.four |
SC150/one hundred fifty | 1500KEPTTimes2EA | ~63m/min ~60m/min |
3 times15Kw times2EA 2x19Kwx2EA | 45Kw 55Kw | SAJ 40-1.4 | |
SC200/two hundred | 2000KEPTTimes2EA | ~60m/min ~63m/min ~70m/min ~75m/min |
two times23Kw times2EA(87Hz) three times15Kw times2EA 3 times19Kw times2EA(87Hz) three times23Kw times2EA(87Hz) |
55Kw
75Kw |
SAJ forty-1.four
SAJ50-1.six |
EPT speed building EPTT carry man raise
Specification | Type/design | EPTCapacity | Lifiting Speed | EPT EPTT | VFD | Safetydevice |
Solitary cage | SC 200 | 2000Kg | ~80m/min ~96m/min |
three times26(87Hz) 3 times18.five(87Hz) |
90Kw 110Kw |
SAJ fifty-2. |
Twin cage | SC200/200 | 2000KEPTTimes2EA | ~80m/min ~96m/min | 2 times3 times26(87Hz) two times3 times18.5(87Hz) | 90Kw times2EA 110Kw times2EA | SAJ fifty-2. |
B. EPTTFUL Initiatives FOR Construction EPTT OVERSEA:
Our developing EPTT lift gentleman lift for EPTT have been exported to UAE, Saudi Arabia, Kuwait, Qatar, Russia, Kazakhstan, Mongolia, Korea, Philippines, Malaysia, Indonesia, Myammar, TEPTTd, Brazil, Barbados, Panama, Guatemala, Venezuela,Slovenia, United kingdom, Denmark and so on.
C. OUR Factory amp Creation:
Proffessional EPT of building EPTT lift male lift.
1. -All Generation Line of developing EPTT lift gentleman elevate adopt EPTT fixture, mould, gauge made by us to make sure all in depth dimension.
2.- Decide on large top quality uncooked material of constructing EPTT elevate man carry from EPTT leading maker and supplier Bao Metal Group, other like motors ,EPTTs, EPTT, basic safety gadget with reduced sound, electrics is schneiEPTTor Korea repute brand name with dependable quality
three.- EPT style,compact and reasonable construction,straightforward to installation and adjustment.
four.- Each and every developing EPTT carry guy lift. should be take a look at and make document in Manufacturing facility, all specifics will be alter like motor brake, protection device procedure, all restrict change procedure, dropping take a look at, loading check, and mast EPT erection test to guarantee the accomplished products operate properly when consider into use.
D. Goods Ready FOR Delivery:
E. Organization PROFILE:
XiHu (West EPT) Dis.NGDOU constructing EPTT lift man lift, are target on all sorts of constructing EPTT lift gentleman elevate for EPTT, tower, bridge,EPT and elevator shaft with different loading capability and variable velocity for fifteen Many years.We are company, solution proviEPTTand EPTT EPTTist !
We, XiHu (West EPT) Dis.NGDOU, A Specialist EPT!
1. fifteen Years creating EPTT raise guy lift EPT encounters
2. ten Several years developing EPTT elevate guy raise Exporting and support records for consumers oversea
3. CE Approved, ISO9001, ISO14001,COC, EAC, TEPTTCertified for construction hoist
four. EPTT EPTrds of Vertical obtain building EPTT elevate gentleman lift max heigEPTT is upto 400m
five. EPTT EPTrds of Vertical accessibility creating EPTT carry guy lift pace is upto 100m/min
six. developing EPTT lift male lift Yearly average exporting rate upto 50%
We, XiHu (West EPT) Dis.NGDOU creating EPTT elevate male elevate, A constructive and efficient Group !
We, XiHu (West EPT) Dis.NGDOU building EPTT lift guy carry, A EPT Motion Crew !
WE, XiHu (West EPT) Dis.NGDOU developing EPTT lift guy carry, KEEPT Good Partnership WITH Clients.
F. FAQ:
EPTT foremost producer for Contruction Raise building Man hoisting Raise with 500kg~3000kg load
one. What are your principal items?
We make all types of EPTT EPTT lift gentleman carry from 500kg load to 3200kg load (also referred to as building elevator, construction elevate) and spare elements of it.
two. Are all EPTT EPTT hoist the exact same from all Suppliers amp EPTs?
Our EPT rise EPTT EPTT lift man carry with VFD for lifting materials and passengers have exported to Europe, Middle and southern The us, most of Asia, and some international locations from Africa, about fifty countries. We can effectively match European stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds, Russia stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds and The usa stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds. We have EPT for deveXiHu (West EPT) Dis.Hu (West EPT) Dis.e new design capability and we assist numerous consumer with good solutions to resolve their development web site EPTT vertical accessibility difficulties.
3. Do your products have some certificates?
Yes. Our EPTT EPTT raise male elevate have passed CE, EAC (Russia),ISO and SASO(Saudia) Certificates.
4. What are the payment terms and the delivery time?
Payment conditions for EPTT EPTT elevate male raise are T/T and LC. We will ship the cargo inside twenty-30 daEPTTafter obtaining the 30% deposit.
5. Are you company or the trader?
We are maker of EPTT EPTT raise male raise with 15 several years maker activities, have EPTd manufacturing line and inspection gadget. Our EPT and deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment crew have acquired several praise from clients.
6. Will you deveXiHu (West EPT) Dis.Hu (West EPT) Dis. distributor and sole agent?
Of course, ought to you have any interest to be our EPTT EPTT carry guy carry distributor and agent, you should enable us know in any approaches. Sole agent is obtainable rely on the product sales turnover.
7. In which do you ship to and what international locations have you accomplished company in?
We provide quick and productive delivery to nations around the world all more than the globe from EPTTngdao port or other EPTT port.
We have carried out enterprise of EPTT EPTT raise male lift with clients in a lot of nations, such as MeXiHu (West EPT) Dis.co, Brazil, Korea, Malaysia, TEPTTd, India, Vietnam, Indonesia, UAE, Qatar, Kuwait,Saudi Arabia and so on.
eight.Quotation ask for:
If you are fascinated in our EPTT EPTT lift man carry, you should give the subsequent parameters:
1) Carry heigEPTT (m)
2) Load potential (ton)
three) EPTT cage or solitary cage
4) Mast tower coat: Portray spray or hot galvanized?
5) Making use of temprature?
six) Regional EPTT offer (V, Hz)
7) Is there any room constrained for your development website? If yes, give us a short drawing to present the space plz
eight) Other EPTT equipments.
9) FOB or CIF price tag? If CIF , plz let us know your destination port.
We will supply best value for EPTT EPTT lift guy raise when verified the over. You can get our feedback inside of 12 hours !